Your installation, step by step

How your NorthTech installation works

From your house plans to the three-month tune-up: what happens at each step, and what we need from you. Nothing here is a surprise on the day.

  • 10steps, plans to handover
  • 4clear stages
  • 2 hrswith you at three months

Step by step

Timeframes follow your builder's program. We confirm dates with you as each step approaches.

Stage 1

Plan and agree

Agree what we're building.
  1. 1

    Design from your house plans

    Send us your builder's or architect's plans. We mark up every room with the systems you want: alarm, CCTV, access control, lighting, audio-visual, network and Control4.

    What we need from you

    The latest plans, and a word about how you use each room.

  2. 2

    Proposal

    You receive a written proposal setting out the design, equipment and scope room by room. We talk it through and adjust it until it suits you.

    What we need from you

    Read it over and tell us what to change.

  3. 3

    Contract signed

    Once you're happy, the proposal becomes your contract. Signing locks in the scope and lets us book your job into our schedule.

    What we need from you

    Sign and return the contract.

Stage 2

Document and rough-in

Every cable documented and into the walls.
  1. 4

    Documented with a cable schedule

    Every cable is recorded in a cable schedule: what it is, where it runs and where it ends. It guides the installation and stays on file for future service.

    What we need from you

    Check the room list matches how you'll use each space.

  2. 5

    Rough-in installation

    While the walls are open, we run all the cables and fit every back box. Getting this right now means no cutting into finished walls later.

    What we need from you

    Site access, and a heads-up if your builder's timing changes.

  3. 6

    Pre-plaster photography

    Before the plasterer closes the walls, we photograph every cable and back box in place. We can always see exactly what's behind a wall.

    What we need from you

    Nothing to do. The photos are kept with your job record.

  4. 7

    Plaster cut-out

    Once plastering is done, we return and cut out each back box so it's ready for fit-off.

    What we need from you

    Let us know when the plaster is finished.

Stage 3

Build and commission

Built, tested and handed over.
  1. 8

    Workshop pre-build

    We build and test your control equipment in our workshop first: racks, switches, controllers and power. Problems get fixed here, not in your home.

    What we need from you

    Nothing to do. We'll confirm your fit-off date.

  2. 9

    Fit-off and programming

    We install the pre-built equipment, fit off every device, then program and test each system. Before we leave, we walk you through how it all works.

    What we need from you

    Be home for the handover walkthrough.

Stage 4

Settle in

Make it fit how you live.
  1. 10

    Three-month visit and customisation

    Three months after installation we visit for two hours to fine-tune your system: scenes, schedules, camera views and user settings, based on how you actually use it.

    What we need from you

    Keep a list of anything you'd like changed as you settle in.

Questions at any stage?

Ask us any time. Once your job is under way, every question stays with it, so nothing gets lost.